{"id":16089,"date":"2026-11-04T15:13:44","date_gmt":"2026-11-04T15:13:44","guid":{"rendered":"https:\/\/westcapital-eg.com\/?post_type=projects&p=16089"},"modified":"2026-11-04T15:13:44","modified_gmt":"2026-11-04T15:13:44","slug":"the-spine-new-cairo","status":"publish","type":"projects","link":"https:\/\/westcapital-eg.com\/en\/projects\/the-spine-new-cairo\/","title":{"rendered":"The Spine Madinaty"},"content":{"rendered":"<p>The Spine Madinaty is a mixed-use project launched by Talaat Moustafa Group inside Madinaty in New Cairo. It is in its launch phase, and construction began in August 2026. As of October 2026, The Spine prices start from EGP 7.9 million, with a 10% down payment and expected delivery in the fourth quarter of 2030. Studios start from EGP 16 million, so we show you the range by unit type.<\/p>\n<h2>About The Spine<\/h2>\n<p>The project is presented as a &#8220;Cognitive City&#8221; and an integrated mixed-use hub inside Madinaty, combining residential, business, retail, leisure and innovation. It is being built within a special investment zone and a free economic zone. The group announced that the project&#8217;s sales passed EGP 30 billion within 15 days of the official launch after the end of the first quarter of 2026, and that this represents more than 65% of the first-year sales target.<\/p>\n<p>The group expects the project&#8217;s sales to exceed EGP 1.7 trillion over the development cycle, and to generate more than EGP 50 billion a year from income-producing assets once fully operational. These figures reflect the scale of the project, but they are the company&#8217;s forecasts and not a guarantee of returns to buyers.<\/p>\n<h2>The Spine location<\/h2>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-12937\" src=\"https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-2.webp\" alt=\"The Spine Madinaty - aerial view of the lake and the commercial area\" width=\"1600\" height=\"974\" srcset=\"https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-2.webp 1600w, https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-2-300x183.webp 300w, https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-2-1024x623.webp 1024w, https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-2-768x468.webp 768w, https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-2-1536x935.webp 1536w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/p>\n<p>The project is inside Madinaty on the Cairo-Suez Road, part of Madinaty in New Cairo. The project plan runs along a corridor of about 5 kilometers around which the towers, commercial areas and green spaces are arranged, and the name &#8220;The Spine&#8221; suggests this lengthwise design.<\/p>\n<p>The project benefits from Madinaty&#8217;s own location, close to El Shorouk, New Heliopolis, the Regional Ring Road and the New Administrative Capital, and from the services already inside the city: a club, schools, a medical complex and malls.<\/p>\n<p>Also see: <a href=\"https:\/\/westcapital-eg.com\/en\/projects\/madinaty-new-cairo\/\">Madinaty New Cairo<\/a> and <a href=\"https:\/\/westcapital-eg.com\/en\/projects\/noor-city-talaat-moustafa\/\">Noor City Talaat Moustafa<\/a>.<\/p>\n<h2>Sizes and unit types<\/h2>\n<p>The master plan area is about 2.125 million sqm, roughly 506 feddans by a rough calculation of dividing the area by 4,200 sqm, while the built-up area is 3.86 million sqm. The project has 165 towers with heights of up to 130 meters.<\/p>\n<ul>\n<li>Studio (Type A): from 68 sqm, which is the unit currently announced.<\/li>\n<li>Grade A+ commercial and administrative space among the project&#8217;s general components.<\/li>\n<li>Hotel units and spa facilities in the plan.<\/li>\n<\/ul>\n<p>We have not yet shown the remaining unit types and their sizes, which is usual at the launch stage, so we recommend contacting us to find out which models the company currently has available.<\/p>\n<h2>The Spine prices and payment plans<\/h2>\n<p>Prices range between EGP 7.9 million for the launch price and EGP 16 million for studios, depending on unit type and payment batch. So:<\/p>\n<ul>\n<li>The Spine prices start from EGP 7.9 million at the announced launch price (October 2026).<\/li>\n<li>Studios start from EGP 16 million, as shown in the units section of the same page.<\/li>\n<\/ul>\n<p>The down payment is 10% at launch, and we will request the official written payment schedule for you. Delivery is in the fourth quarter of 2030 (December 2030), and construction began on 12 August 2026. These figures are indicative and not an official quote, and inventory may change quickly because the project may sell out.<\/p>\n<h2>The developer: Talaat Moustafa Group<\/h2>\n<p><img decoding=\"async\" class=\"aligncenter size-full wp-image-12939\" src=\"https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-3.webp\" alt=\"The Spine Madinaty - the walkway and green spaces\" width=\"1600\" height=\"1518\" srcset=\"https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-3.webp 1600w, https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-3-300x285.webp 300w, https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-3-1024x972.webp 1024w, https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-3-768x729.webp 768w, https:\/\/westcapital-eg.com\/wp-content\/uploads\/2026\/10\/the-spine-new-cairo-3-1536x1457.webp 1536w\" sizes=\"(max-width: 1600px) 100vw, 1600px\" \/><\/p>\n<p><a href=\"https:\/\/westcapital-eg.com\/en\/developer\/talaat-moustafa-group\/\">Talaat Moustafa Group<\/a> is carrying out the project inside Madinaty, where construction began in July 2006 on an area of nearly 8,000 feddans. The group also owns other major projects such as Al Rehab and Noor City. Madinaty is the strongest practical proof of the developer&#8217;s ability to deliver a whole city with its services, which gives the group&#8217;s new projects an advantage of trust among many buyers, though you should still read the written handover dates in the contract for each phase.<\/p>\n<h2>Services and facilities at The Spine<\/h2>\n<p>The project plan includes:<\/p>\n<ul>\n<li>Hotels, spa facilities and high-speed elevators.<\/li>\n<li>Camera surveillance systems and central cooling.<\/li>\n<li>An urban tram network inside the project.<\/li>\n<li>More than one million square meters of gardens and landscaped areas.<\/li>\n<li>Retail and leisure areas and Grade A+ office space.<\/li>\n<li>An AI-powered central control center and a digital platform for residents.<\/li>\n<\/ul>\n<p>These components are part of the project&#8217;s announced vision and may be built in phases, so ask which components are actually delivered in each phase and when. It is also wise to ask about management and maintenance fees for shared facilities such as central cooling and the internal tram, because they may affect a unit&#8217;s annual cost compared with a similar unit in a traditional compound, and about the staged handover schedule for the different towers along the central corridor.<\/p>\n<h2>What is announced and what is not yet<\/h2>\n<p>Because the project is at the start of its journey, we advise you to separate what the company has officially announced from what is still undefined:<\/p>\n<ul>\n<li>Announced: the location inside Madinaty, the master plan area, the number of towers and their maximum height, the launch price, the down payment, the expected delivery date, and sales in the first 15 days.<\/li>\n<li>Not announced in the information we reviewed: the total number of units, the full size table for each type, the exact installment period, and the type of finishing.<\/li>\n<li>The price discrepancy between EGP 7.9 million and EGP 16 million requires asking the company which unit type each figure refers to.<\/li>\n<\/ul>\n<p>At this stage it helps to contract only after seeing the contract template and the written unit specifications, and to make sure the studio or administrative unit you are buying suits the use you intend for it.<\/p>\n<h2>Who is The Spine suited to?<\/h2>\n<p>The project suits someone looking for a unit inside Madinaty with a dense urban lifestyle close to services and business, or someone considering long-term investment in an area where the company is investing heavily. Someone looking for a villa with a large garden or near-term handover may be better served by Madinaty&#8217;s existing groups or ready Fifth Settlement compounds, because The Spine&#8217;s handover is scheduled for 2030.<\/p>\n<h2>The Spine in brief<\/h2>\n<p>The Spine is a mixed-use project inside Madinaty on about 506 feddans by calculation, with prices starting from EGP 7.9 million (EGP 16 million for studios), a 10% down payment and delivery in the fourth quarter of 2030. Its strengths are the developer&#8217;s scale and the announced sales momentum. The points for caution are the long wait and the lack of clarity on some unit details and the installment period so far.<\/p>\n<h2>Why buy through West Capital<\/h2>\n<ul>\n<li>We track which units at The Spine are actually available and their updated prices, and we separate the promotional figure from the price you can contract at.<\/li>\n<li>We compare the project with Madinaty&#8217;s existing groups and New Cairo compounds to suit your budget and handover date.<\/li>\n<li>We go through the payment schedule, the down payment and the fees with you before reservation.<\/li>\n<li>Full follow-up of contracting procedures with no extra fees.<\/li>\n<\/ul>\n<p>Also explore more <a href=\"https:\/\/westcapital-eg.com\/en\/cites\/new-cairo\/\">New Cairo compounds and projects<\/a>, including <a href=\"https:\/\/westcapital-eg.com\/en\/projects\/madinaty-new-cairo\/\">Madinaty New Cairo<\/a>, <a href=\"https:\/\/westcapital-eg.com\/en\/projects\/noor-city-talaat-moustafa\/\">Noor City Talaat Moustafa<\/a> and <a href=\"https:\/\/westcapital-eg.com\/en\/projects\/taj-city-new-cairo\/\">Taj City Compound New Cairo<\/a>, see the rest of the projects by <a href=\"https:\/\/westcapital-eg.com\/en\/developer\/talaat-moustafa-group\/\">Talaat Moustafa Group<\/a>, and read our guide to <a href=\"https:\/\/westcapital-eg.com\/en\/malls-new-cairo\/\">New Cairo and Fifth Settlement malls<\/a>.<\/p>\n<h2>Frequently asked questions about The Spine<\/h2>\n<h3>Where is The Spine located?<\/h3>\n<p>Inside Madinaty on the Cairo-Suez Road in New Cairo, along a central corridor of about 5 kilometers.<\/p>\n<h3>How big is The Spine?<\/h3>\n<p>The master plan is about 2.125 million sqm, roughly 506 feddans by a rough calculation, and the built-up area is 3.86 million sqm.<\/p>\n<h3>How much do The Spine prices start from?<\/h3>\n<p>From EGP 7.9 million at the launch price, while studios start from EGP 16 million in the units section. Contact us for the latest prices.<\/p>\n<h3>What is the payment plan at The Spine?<\/h3>\n<p>A 10% down payment at launch. The page does not state the installment period clearly, so we recommend asking for the official schedule.<\/p>\n<h3>When is delivery at The Spine?<\/h3>\n<p>Expected delivery is in the fourth quarter of 2030 (December 2030), after construction began in August 2026.<\/p>\n<h3>Who is The Spine&#8217;s developer?<\/h3>\n<p>Talaat Moustafa Group. To inquire, contact West Capital on WhatsApp at 01002200212.<\/p>\n<p style=\"text-align: center\"><strong><a href=\"https:\/\/wa.me\/201002200212\" target=\"_blank\" rel=\"noopener\">Ask about what&#8217;s available now on WhatsApp<\/a><\/strong><\/p>\n","protected":false},"featured_media":12935,"template":"","cites":[82],"class_list":["post-16089","projects","type-projects","status-publish","has-post-thumbnail","hentry","cites-new-cairo-en"],"_links":{"self":[{"href":"https:\/\/westcapital-eg.com\/en\/wp-json\/wp\/v2\/projects\/16089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/westcapital-eg.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/westcapital-eg.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"version-history":[{"count":0,"href":"https:\/\/westcapital-eg.com\/en\/wp-json\/wp\/v2\/projects\/16089\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/westcapital-eg.com\/en\/wp-json\/wp\/v2\/media\/12935"}],"wp:attachment":[{"href":"https:\/\/westcapital-eg.com\/en\/wp-json\/wp\/v2\/media?parent=16089"}],"wp:term":[{"taxonomy":"cites","embeddable":true,"href":"https:\/\/westcapital-eg.com\/en\/wp-json\/wp\/v2\/cites?post=16089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}